FREQUENT ASKED QUESTIONS
  • How to determine Minimum power rating?

    Certain appliances have a higher start-up rating than the normal operating rating. You should therefore take this into account when making your  generator choice.
    To calculate the power you need at start-up, apply the multiplier coefficient provided, for information purposes only, in the below table.
    To find out the minimum capacity of your appliances, refer to the manufacturer’s technical documentation.

    Equipment with small motors:  coefficient 1.2
    Equipment with large motors:  coefficient 3.5

    Resistive devices:  coefficient 1

    COEFFICIENT PMR 
    Vacuum cleaner1.2
    Forced air heating2
    Mixer2
    Cement mixer3.5
    Air conditioning unit3.5
    Furnace (mobile)1.2
    Plastering machine3.5
    Grinder ( hand)1.2
    Mini display cooler3.5
    Hoist2
    High-pressure washer3.5
    Inverter3.5
    Drill ( hand )1.2
    Drill / breaker3.5
    Belt sander1.2
    Refrigerator and freezer3.5
    Circular saw3.5
    jigsaw ( hand)1.2
    Water pump3.5

    Example: to power a 1000W grinder, you will need a generating set of 1500W (1.000W x 1.2)

    What is an Automatic Transfer Switch (ATS)?

    It is the brains behind the system.
    An ATS monitors the utility voltage, senses utility failure, starts and runs the generator, switches the electric load from utility to the generator.
    Senses the return of utility power, switches the load back to utility and finally, after a short cool down period, turns off the generator.
    An ATS is sized in volts and amps and is matched to the generator and the utility service.

    How ATS works?

    The Automatic Transfer Switch (ATS) constantly monitors the utility power.
    If there is an interruption in utility service, the ATS disconnects the utility service from the distribution panel and starts the generator.

    When mains power fails the ATS will pause for a set period (determined at set up by the engineer) to ensure you haven’t had a power spike.

    Once the generator is producing power the ATS connects the generator to the distribution panel.
    The standby generator is providing power to the distribution panel. This process takes from 10-20 seconds.

    When the ATS senses that utility service is properly restored, it disconnects the generator from the distribution panel and reconnects the utility service.
    After transferring back to utility service the generator goes through a cool down period of about 10-15 minutes, then shuts down.
    The system is back in standby, ready to respond to the next power failure.

     

    This insures that the system is indeed stand-by ready for the next time it is called on to power-up in the event of a utility failure.

    How to connect ATS to Service Panelboard?

    Installing your transfer switch ahead of your main breaker is relatively simple.

    However minimal changes to your existing wiring may be required while making the installation.

    Because of the complexities of some type of mianboards & wiring your transfer switch this way, it’s STRONGLY suggested hire a licensed electrical contractor to make the installation.

COPYRIGHT © 2015 POWERCARE.COM.AU

Someone in Kosciuszko NSW, 2624  just watched
Diesel Generator 10KVA Silent 3 Phase 415V/240V 2-cyl
about 1 minutes ago

Someone in Dromedary QLD, 4718  just watched
3 inch KOOP High Pressure 11HP Diesel Water Pump
about 2 minutes ago

Someone in Silkwood East QLD, 4857  just watched
Diesel Welder & Generator KOOP 180AMP Electric Start
about 1 minutes ago

Someone in Marlee NSW, 2429  just watched
Diesel High Preassure PRO Fire Pump V-twin 25HP Electric Start
about 7 minutes ago

Someone in Tewantin QLD, 4565  bought a
2 inch Pressure 13HP Cast Iron Diesel Water Pump
about 4 days ago

Someone in Neale WA, 6440  just watched
Stationary Silent Diesel Generator 12.5KVA 240V
about 3 minutes ago

Someone in Tathra NSW, 2550  just watched
Kubota Diesel Welder Generator 240/415V 250-500A 10KVA
about 9 minutes ago

Someone in Clifton Grove NSW, 2800  just watched
Diesel Concrete Cutter 40cm blade, cutting depth 15cm
about 10 minutes ago

Someone in Limpinwood NSW, 2484  bought a
KOOP Diesel Air Compressor 11HP with Electric Start
about 3 days ago

Someone in Moona Plains NSW, 2354  just watched
36Ah BATTERY MAINTANACE FREE
about 7 minutes ago

Someone in Lakesland NSW, 2572  just watched
ATS Control Switch - single phase 240V
about 2 minutes ago

Someone in Casterton VIC, 3311  just watched
3 inch KOOP High Pressure 11HP Diesel Water Pump
about 7 minutes ago

Someone in Wantiool NSW, 2663  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 8 minutes ago

Someone in Rose Valley NSW, 2630  just watched
2 inch HighPressure Diesel Water Pump twin impeller 11HP
about 4 minutes ago