FREQUENT ASKED QUESTIONS
  • How to determine Minimum power rating?

    Certain appliances have a higher start-up rating than the normal operating rating. You should therefore take this into account when making your  generator choice.
    To calculate the power you need at start-up, apply the multiplier coefficient provided, for information purposes only, in the below table.
    To find out the minimum capacity of your appliances, refer to the manufacturer’s technical documentation.

    Equipment with small motors:  coefficient 1.2
    Equipment with large motors:  coefficient 3.5

    Resistive devices:  coefficient 1

    COEFFICIENT PMR 
    Vacuum cleaner1.2
    Forced air heating2
    Mixer2
    Cement mixer3.5
    Air conditioning unit3.5
    Furnace (mobile)1.2
    Plastering machine3.5
    Grinder ( hand)1.2
    Mini display cooler3.5
    Hoist2
    High-pressure washer3.5
    Inverter3.5
    Drill ( hand )1.2
    Drill / breaker3.5
    Belt sander1.2
    Refrigerator and freezer3.5
    Circular saw3.5
    jigsaw ( hand)1.2
    Water pump3.5

    Example: to power a 1000W grinder, you will need a generating set of 1500W (1.000W x 1.2)

    What is an Automatic Transfer Switch (ATS)?

    It is the brains behind the system.
    An ATS monitors the utility voltage, senses utility failure, starts and runs the generator, switches the electric load from utility to the generator.
    Senses the return of utility power, switches the load back to utility and finally, after a short cool down period, turns off the generator.
    An ATS is sized in volts and amps and is matched to the generator and the utility service.

    How ATS works?

    The Automatic Transfer Switch (ATS) constantly monitors the utility power.
    If there is an interruption in utility service, the ATS disconnects the utility service from the distribution panel and starts the generator.

    When mains power fails the ATS will pause for a set period (determined at set up by the engineer) to ensure you haven’t had a power spike.

    Once the generator is producing power the ATS connects the generator to the distribution panel.
    The standby generator is providing power to the distribution panel. This process takes from 10-20 seconds.

    When the ATS senses that utility service is properly restored, it disconnects the generator from the distribution panel and reconnects the utility service.
    After transferring back to utility service the generator goes through a cool down period of about 10-15 minutes, then shuts down.
    The system is back in standby, ready to respond to the next power failure.

     

    This insures that the system is indeed stand-by ready for the next time it is called on to power-up in the event of a utility failure.

    How to connect ATS to Service Panelboard?

    Installing your transfer switch ahead of your main breaker is relatively simple.

    However minimal changes to your existing wiring may be required while making the installation.

    Because of the complexities of some type of mianboards & wiring your transfer switch this way, it’s STRONGLY suggested hire a licensed electrical contractor to make the installation.

Phone
Quote

captcha

COPYRIGHT © 2018 POWERCARE.COM.AU

SEO Melbourne by Binary Trends.

Someone in Captains Flat NSW, 2623  just watched
Diesel Water Pump KOOP 4 inch 10HP ELECTRIC START
about 1 minutes ago

Someone in Newport VIC, 3015  just watched
Diesel Generator 10KVA Silent 3 Phase 415V/240V 2-cyl
about 9 minutes ago

Someone in Menzies Creek VIC, 3159  bought a
Diesel Water Pump KOOP 4 inch 10HP ELECTRIC START
about 58 minutes ago

Someone in Urrbrae SA, 5064  just watched
KOOP 6 inch Diesel Water Pump 2800L/min
about 9 minutes ago

Someone in Summer Hill Creek NSW, 2800  just watched
DIESEL TRASH PUMP 3 inch with Electric Start. 13HP
about 2 minutes ago

Someone in Mount Cooper NSW, 2631  just watched
3 phase Silent Diesel Generator 7.5KVA Combo 415V/240V
about 7 minutes ago

Someone in Drumcondra VIC, 3215  just watched
33KVA diesel generator Perkins, Mine Spec
about 8 minutes ago

Someone in Hillman WA, 6168  just watched
Stationary Silent Diesel Generator 12.5KVA 240V
about 8 minutes ago

Someone in St Fillans NSW, 2850  just watched
3 phase Diesel Generator 6.5KVA KOOP Silent 415V/240V
about 4 minutes ago

Someone in Marian QLD, 4753  just watched
Kubota Diesel Welder Generator 240/415V 250-500A 10KVA
about 7 minutes ago

Someone in Lagoon Pocket QLD, 4570  bought a
Diesel Fire Pump 13HP with Electric Start, Free battery
about 1 days ago

Someone in Mount Burr SA, 5279  just watched
Diesel Concrete Cutter 40cm blade, cutting depth 15cm
about 1 minutes ago

Someone in Mount Burr SA, 5279  just watched
Camlock fittings Stainless Steel
about 7 minutes ago

Someone in Wattle Ridge NSW, 2575  just watched
Stationary Silent Diesel Generator 15KVA 240/415V
about 1 minutes ago

Someone in Mumbil NSW, 2820  just watched
Hydraulic pump 11GPM Log splitter type
about 1 minutes ago

Someone in Elliott QLD, 4670  just watched
Stationary Diesel Generator 25KVA 3-Phase Soundproof
about 5 minutes ago

Someone in Ardmona VIC, 3629  just watched
Fuel Pump 186, 188 to Diesel engine air cooled
about 6 minutes ago

Someone in Laidley North QLD, 4341  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 5 minutes ago

Someone in Mawson TAS, 7151  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 4 minutes ago

Someone in Greenwich NSW, 2065  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 10 minutes ago

Someone in Wollangambe NSW, 2790  just watched
3 phase Silent Diesel Generator 7.5KVA Combo 415V/240V
about 6 minutes ago

Someone in Westmar QLD, 4422  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 10 minutes ago

Someone in Menai Central NSW, 2234  just watched
7KVA Super Silent 65dB Diesel generator 240V
about 7 minutes ago