FREQUENT ASKED QUESTIONS
  • How to determine Minimum power rating?

    Certain appliances have a higher start-up rating than the normal operating rating. You should therefore take this into account when making your  generator choice.
    To calculate the power you need at start-up, apply the multiplier coefficient provided, for information purposes only, in the below table.
    To find out the minimum capacity of your appliances, refer to the manufacturer’s technical documentation.

    Equipment with small motors:  coefficient 1.2
    Equipment with large motors:  coefficient 3.5

    Resistive devices:  coefficient 1

    COEFFICIENT PMR 
    Vacuum cleaner1.2
    Forced air heating2
    Mixer2
    Cement mixer3.5
    Air conditioning unit3.5
    Furnace (mobile)1.2
    Plastering machine3.5
    Grinder ( hand)1.2
    Mini display cooler3.5
    Hoist2
    High-pressure washer3.5
    Inverter3.5
    Drill ( hand )1.2
    Drill / breaker3.5
    Belt sander1.2
    Refrigerator and freezer3.5
    Circular saw3.5
    jigsaw ( hand)1.2
    Water pump3.5

    Example: to power a 1000W grinder, you will need a generating set of 1500W (1.000W x 1.2)

    What is an Automatic Transfer Switch (ATS)?

    It is the brains behind the system.
    An ATS monitors the utility voltage, senses utility failure, starts and runs the generator, switches the electric load from utility to the generator.
    Senses the return of utility power, switches the load back to utility and finally, after a short cool down period, turns off the generator.
    An ATS is sized in volts and amps and is matched to the generator and the utility service.

    How ATS works?

    The Automatic Transfer Switch (ATS) constantly monitors the utility power.
    If there is an interruption in utility service, the ATS disconnects the utility service from the distribution panel and starts the generator.

    When mains power fails the ATS will pause for a set period (determined at set up by the engineer) to ensure you haven’t had a power spike.

    Once the generator is producing power the ATS connects the generator to the distribution panel.
    The standby generator is providing power to the distribution panel. This process takes from 10-20 seconds.

    When the ATS senses that utility service is properly restored, it disconnects the generator from the distribution panel and reconnects the utility service.
    After transferring back to utility service the generator goes through a cool down period of about 10-15 minutes, then shuts down.
    The system is back in standby, ready to respond to the next power failure.

     

    This insures that the system is indeed stand-by ready for the next time it is called on to power-up in the event of a utility failure.

    How to connect ATS to Service Panelboard?

    Installing your transfer switch ahead of your main breaker is relatively simple.

    However minimal changes to your existing wiring may be required while making the installation.

    Because of the complexities of some type of mianboards & wiring your transfer switch this way, it’s STRONGLY suggested hire a licensed electrical contractor to make the installation.

Quote

captcha

COPYRIGHT © 2017 POWERCARE.COM.AU

Someone in San Remo NSW, 2262  just watched
KOOP Diesel Generator 3KVA with Remote Control Start
about 4 minutes ago

Someone in Guildford NSW, 2161  just watched
KOOP 6 inch Diesel Water Pump 2800L/min
about 3 minutes ago

Someone in Takilberan QLD, 4671  bought a
Diesel Welder & Generator KOOP 180AMP Electric Start
about 52 minutes ago

Someone in Buckenbowra NSW, 2536  just watched
DIESEL TRASH PUMP 3 inch with Electric Start. 13HP
about 4 minutes ago

Someone in Drildool NSW, 2386  just watched
33KVA diesel generator Perkins, Mine Spec
about 7 minutes ago

Someone in Condah Swamp VIC, 3286  just watched
3 phaseKOOP Diesel Generator 10KVA Silent 240/415V
about 4 minutes ago

Someone in Miltalie SA, 5602  just watched
Diesel Fire Pump 13HP with Electric Start, Free battery
about 3 minutes ago

Someone in Laidley North QLD, 4341  just watched
Diesel Concrete Cutter 40cm blade, cutting depth 15cm
about 4 minutes ago

Someone in Windera NSW, 2800  just watched
Miller bobcat 250 Welder Generator 250AMP
about 7 minutes ago

Someone in Yarras NSW, 2795  just watched
Hydraulic pump 11GPM Log splitter type
about 7 minutes ago

Someone in Christmas Creek QLD, 4285  just watched
40T Diesel Log Splitter 13HP Electric Start, Hydraulic Lift
about 3 minutes ago

Someone in Gowan NSW, 2795  just watched
2 inch Pressure 13HP Cast Iron Diesel Water Pump
about 8 minutes ago

Someone in Tabooba QLD, 4285  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 4 minutes ago

Someone in Curramore NSW, 2533  just watched
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 1 minutes ago

Someone in Capalaba West QLD, 4157  just watched
Hydraulic pump 11GPM Log splitter type
about 8 minutes ago