FREQUENT ASKED QUESTIONS
  • How to determine Minimum power rating?

    Certain appliances have a higher start-up rating than the normal operating rating. You should therefore take this into account when making your  generator choice.
    To calculate the power you need at start-up, apply the multiplier coefficient provided, for information purposes only, in the below table.
    To find out the minimum capacity of your appliances, refer to the manufacturer’s technical documentation.

    Equipment with small motors: coefficient 1.2
    Equipment with large motors: coefficient 3.5

    Resistive devices: coefficient 1

    COEFFICIENT PMR 
    Vacuum cleaner1.2
    Forced air heating2
    Mixer2
    Cement mixer3.5
    Air conditioning unit3.5
    Furnace (mobile)1.2
    Plastering machine3.5
    Grinder ( hand)1.2
    Mini display cooler3.5
    Hoist2
    High-pressure washer3.5
    Inverter3.5
    Drill ( hand )1.2
    Drill / breaker3.5
    Belt sander1.2
    Refrigerator and freezer3.5
    Circular saw3.5
    jigsaw ( hand)1.2
    Water pump3.5

    Example: to power a 1000W grinder, you will need a generating set of 1500W (1.000W x 1.2)

    What is an Automatic Transfer Switch (ATS)?

    It is the brains behind the system.
    An ATS monitors the utility voltage, senses utility failure, starts and runs the generator, switches the electric load from utility to the generator.
    Senses the return of utility power, switches the load back to utility and finally, after a short cool down period, turns off the generator.
    An ATS is sized in volts and amps and is matched to the generator and the utility service.

    How ATS works?

    The Automatic Transfer Switch (ATS) constantly monitors the utility power.
    If there is an interruption in utility service, the ATS disconnects the utility service from the distribution panel and starts the generator.

    When mains power fails the ATS will pause for a set period (determined at set up by the engineer) to ensure you haven’t had a power spike.

    Once the generator is producing power the ATS connects the generator to the distribution panel.
    The standby generator is providing power to the distribution panel. This process takes from 10-20 seconds.

    When the ATS senses that utility service is properly restored, it disconnects the generator from the distribution panel and reconnects the utility service.
    After transferring back to utility service the generator goes through a cool down period of about 10-15 minutes, then shuts down.
    The system is back in standby, ready to respond to the next power failure.

     

    This insures that the system is indeed stand-by ready for the next time it is called on to power-up in the event of a utility failure.

    How to connect ATS to Service Panelboard?

    Installing your transfer switch ahead of your main breaker is relatively simple.

    However minimal changes to your existing wiring may be required while making the installation.

    Because of the complexities of some type of mianboards & wiring your transfer switch this way, it’s STRONGLY suggested hire a licensed electrical contractor to make the installation.

    ATSinstalation

Phone
Quote

captcha

COPYRIGHT © 2018 POWERCARE.COM.AU

SEO Melbourne by Binary Trends.
firefightingpump

Someone in Rural View QLD, 4740  just watched
Diesel High Preassure PRO Fire Pump V-twin 21HP Electric Start
about 7 minutes ago

Kubotadieselgenerators

Someone in Summer Hill Creek NSW, 2800  just watched
20KVA Diesel Generator Kubota Powered, Silent 240V
about 1 minutes ago

KDF10000Q

Someone in Loch Valley VIC, 3833  just watched
3 phaseKOOP Diesel Generator 10KVA Silent 240/415V
about 8 minutes ago

firewaterpump

Someone in Lilli Pilli NSW, 2229  just watched
Diesel Fire Pump 13HP with Electric Start, Free battery
about 10 minutes ago

16GMPpump

Someone in Tullimbar NSW, 2527  just watched
Hydraulic pump 11GPM Log splitter type
about 2 minutes ago

log_splitter_for_sale

Someone in Wilbetree NSW, 2850  just watched
40T Diesel Log Splitter 13HP Electric Start, Hydraulic Lift
about 4 minutes ago

KOOP diesel water pump

Someone in Eungai Creek NSW, 2441  just watched
3 inch KOOP High Pressure 13HP Diesel Water Pump 90M Head
about 10 minutes ago

koop irrigation diesel water pump

Someone in Beresfield NSW, 2322  just watched
2 inch Pressure 13HP Cast Iron Diesel Water Pump 90M max Head
about 2 minutes ago

8kvaDIESELGENERATOR

Someone in Windera NSW, 2800  bought a
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 36 minutes ago

MG_2782

Someone in Brownsville NSW, 2530  just watched
KOOP Diesel Generator 3KVA with Remote Control Start
about 2 minutes ago

kdf7500q01

Someone in Duckinwilla QLD, 4650  just watched
3 phase Silent Diesel Generator 7.5KVA Combo 415V/240V
about 1 minutes ago

8kvaDIESELGENERATOR

Someone in North Macquarie NSW, 2527  bought a
Diesel Generator 7.0KVA KOOP Silent 240V single phase
about 40 minutes ago

airfilter

Someone in Capels Crossing VIC, 3579  just watched
AIR FILTER
about 7 minutes ago

2 inch pump 02_a

Someone in Gosse SA, 5223  just watched
2 inch High Pressure Diesel Water Pump twin impeller 13HP with R/C
about 1 minutes ago

kdf7500q01

Someone in East Perth WA, 6004  just watched
3 phase Silent Diesel Generator 7.5KVA Combo 415V/240V
about 2 minutes ago

KOOPdiesel_generator_KDF8500QQ

Someone in Yarras NSW, 2795  just watched
7KVA Super Silent 65dB Diesel generator 240V
about 9 minutes ago

2 inch pump 02_a

Someone in Allan QLD, 4370  just watched
2 inch High Pressure Diesel Water Pump twin impeller 13HP with R/C
about 1 minutes ago